Spaceway undertakes huge mezzanine floor construction for Westcon
December 20, 2021
Our two-minute mezzanine has 8,000 hits and growing!
December 20, 2021

London-based pharmacy and health supplies distribution specialist Jumbogate had grown the business at such a rate that it had simply run out of space. As the orders kept coming in, it needed a space solution fast.

Even though Jumbogate soon secured a 45,000sq.ft  industrial building in a good location, it was run down and needed a complete refurbishment.

Spaceway was invited to meet with the business owners and discuss possible space solutions and ideas after coming highly recommended by a mutual business contact. After ideas and prices had been presented and discussed, Spaceway was soon selected as the main contractor for the design and build contract.

The project started when Spaceway obtained full building control approval for the project, submitting structural calculations, fire certifications and engineering drawings along with a formal application on the clients’ behalf. The final designs were presented for construction and dates for completion agreed.

The project got underway soon after approval and included a 20,000sq.ft  mezzanine floor installation with steel staircases , steel partitioning, roller shutter doors and a mezzanine goods lift to the first floor. The first floor was fitted with new heavy industrial floor tiles that can easily be uplifted and replaced as well as take heavy trolley, pallet and fork lift truck loads. The client was so pleased that the entire ground floor was also fitted with them.

Shelving and racking systems were fitted including the latest energy efficient lighting complete with movement detectors in each racking aisle.

A full L1 fire alarm and smoke detection system was fitted along with a security systems to the clients specific insurance requirements.

Once the warehouse was fitted out and handed back for client operations, Spaceway was given the task to refurbish the existing offices with the addition of fully glazed partitioning, carpets and air conditioning.

Finally, the last part of the project was to fit perimeter security fencing and a large motorised sliding steel gate to the entrance of the premises.

Comments are closed.

Use our Free Online Calculator to find
out how much a new Mezzanine Floor
might cost.

Testimonials

Richard De Crausaz

Cookson Electronics

Spaceway worked with us to create the perfect environment for our staff. The completed project was fantastic and utilised the space to provide  practical, modern and attractive working surroundings.

Coopervision

The project was designed to meet our specific requirements which included fitting in 20 more additional workstations using the existing space. The design works well and has met our expectations fully, we will continue to use Spaceway, they do a good job.

Specsavers

The project was challenging to say the least with the removal of 280 workstations and fitting of 400 new ones, along with collaboration areas and 400 bespoke lockers over two weekends, but Spaceway managed to complete this along with office refurbishment works on time and to an excellent standard.

Greg Bedford

Eurotubes

It’s no good having just an empty industrial building you need a concept for space, a design, an infrastructure and someone to build it. Designing something like this from scratch with someone who’s willing to invest in your ideas, Spaceway is your perfect partner.

Mark Rowe

Glenmore Consultants

The office fit out is superbly finished to the highest standards and beyond our expectations.

Nick Aikenhead

MD, ALPMA UK

"I’m very pleased how they’ve gone through it all and actioned it and they’ve got good depth of resource, good depth of people, and good skilled people who work well and tightly and good communication. So I’m delighted."

Paul Callus

Plastimo UK Limited

We are delighted with the finished product. The space has been turned into an exceptional working environment, which will serve us well for years to come

Alan Fisher

Car Link

“I was so happy I did not get bothered throughout the extensive works and that a strict timetable was completed flawlessly. Fantastic experience all round.”

Redmayne Engineering

We were delighted with the service from Spaceway.

Stone Bridge United

We're very impressed with the Spaceway team and the whole project was installed without fault. We are looking forward to working with the team again.

Lydiard Park Academy

Our project was finished on time and to budget in what was a very short timescale, which is a credit to the team at Spaceway!

A J Wells

Another project well done by Spaceway. As before, we're very pleased with everything from concept through to completion.

Bodywise

Thank you to Spaceway for the improvements that have been made to move Bodywise forward. You've done a very good job and we look forward to working with you again.
Get In Touch