When Hampshire-based CTS Specialist Freight needed a design and build interior fit out project completed to an extremely tight timescale, it soon realised that by choosing Spaceway the company could be rest assured the job would get done with minimal fuss.

basingstoke-mezzanine-floors basingstoke-pallet-racking-systems

CTS needed a brand new 10,000sq.ft industrial unit it had acquired in Basingstoke to be converted into a sophisticated warehouse and distribution facility, in less than 8 weeks from receiving the keys to the building as it had a contract with a client to deliver on.

The project required high bay pallet racking, mezzanine floors, steel demountable partitioning, high security caging and an extensive office fit out with office furniture and fully glazed partitioning.

However, the key to the project and deciding factor for CTS, was that Spaceway could project manage the entire fit out. This included the installation of a sophisticated security system with HD (high definition) CCTV, high speed security shutter doors and the latest energy efficient air conditioning and LED lighting systems.

Spaceway is famous for mezzanine floors, partitions and racking solutions, but in recent years has delivered many multi-faceted design and build projects including electrics, air conditioning, security and LED lighting systems.

Dominic O’Brien, director at Spaceway said: “We knew when we took on this project that the client not only wanted the latest demountable equipment to be used, but that it also needed it all delivered and installed in record time. Although this was a challenge to get everything completed, I was confident that once all the materials arrived on site our project managers and installation teams would see it through.

“The client was particularly impressed with a new flooring system we used in the busy transport office, that simply and speedily clipped together without the need for levelling screeds or specialist fitters. It’s also extremely hard wearing and can be removed without any floor repairs after.”

The project was completed by Spaceway on time and to budget.

Comments are closed.

Use our Free Online Calculator to find
out how much a new Mezzanine Floor
might cost.

Testimonials

Coopervision

The project was designed to meet our specific requirements which included fitting in 20 more additional workstations using the existing space. The design works well and has met our expectations fully, we will continue to use Spaceway, they do a good job.

Greg Bedford

Eurotubes

It’s no good having just an empty industrial building you need a concept for space, a design, an infrastructure and someone to build it. Designing something like this from scratch with someone who’s willing to invest in your ideas, Spaceway is your perfect partner.

Stone Bridge United

We're very impressed with the Spaceway team and the whole project was installed without fault. We are looking forward to working with the team again.

Mark Rowe

Glenmore Consultants

The office fit out is superbly finished to the highest standards and beyond our expectations.

A J Wells

Another project well done by Spaceway. As before, we're very pleased with everything from concept through to completion.

Alan Fisher

Car Link

“I was so happy I did not get bothered throughout the extensive works and that a strict timetable was completed flawlessly. Fantastic experience all round.”

Richard De Crausaz

Cookson Electronics

Spaceway worked with us to create the perfect environment for our staff. The completed project was fantastic and utilised the space to provide  practical, modern and attractive working surroundings.

Bodywise

Thank you to Spaceway for the improvements that have been made to move Bodywise forward. You've done a very good job and we look forward to working with you again.

Nick Aikenhead

MD, ALPMA UK

"I’m very pleased how they’ve gone through it all and actioned it and they’ve got good depth of resource, good depth of people, and good skilled people who work well and tightly and good communication. So I’m delighted."

Specsavers

The project was challenging to say the least with the removal of 280 workstations and fitting of 400 new ones, along with collaboration areas and 400 bespoke lockers over two weekends, but Spaceway managed to complete this along with office refurbishment works on time and to an excellent standard.

Lydiard Park Academy

Our project was finished on time and to budget in what was a very short timescale, which is a credit to the team at Spaceway!

Redmayne Engineering

We were delighted with the service from Spaceway.

Paul Callus

Plastimo UK Limited

We are delighted with the finished product. The space has been turned into an exceptional working environment, which will serve us well for years to come
Get In Touch