SPK Property
December 11, 2021
Eurotubes
December 11, 2021

Marketing Sciences

CLIENT: MARKETING SCIENCES
LOCATION: WINCHESTER, HAMPSHIRE
DURATION: 10 WEEKS
COST: £800k
TYPE: FULL DESIGN & BUILD
SPACES: TEST & RESEARCH LAB

Marketing Sciences

Products used

CLEANROOM PARTITIONING      MEZZANINE FLOOR SUPPORT STRUCTURE      AIR HANDLING      ELECTRICS    LED LIGHTING      FLOORING      BENCHES & SEATING

About the project

Established in 1977 Marketing Sciences provide detailed research services for Food, healthcare, and animal health studies. The philosophy is to offer clients a high-quality product, whether they require straightforward research or a  complex in-depth study that demands the highest levels of creative input or technical expertise and sophistication.

Spaceway developed a design to meet the client’s specific needs. this process was a team effort with a number of plans and designs revised until the final design was agreed upon.

The space required a full strip out and new refurbishment. the challenge was to deliver a high-quality project with so little space to work in.

Client Comment

“We had specific requirements so we needed a company to work with us and develop our ideas with them and build something that was high quality but also looked good.

Spaceway produced plans and designs very promptly and were able to build to a high standard. Once we had agreed the quotation they started work almost immediately, it took us by surprise to a degree but in a nice way.”

Steve Grundy – Marketing Sciences Director

Use our Free Online Calculator to find
out how much a new Mezzanine Floor
might cost.

Testimonials

Alan Fisher

Car Link

“I was so happy I did not get bothered throughout the extensive works and that a strict timetable was completed flawlessly. Fantastic experience all round.”

Specsavers

The project was challenging to say the least with the removal of 280 workstations and fitting of 400 new ones, along with collaboration areas and 400 bespoke lockers over two weekends, but Spaceway managed to complete this along with office refurbishment works on time and to an excellent standard.

Greg Bedford

Eurotubes

It’s no good having just an empty industrial building you need a concept for space, a design, an infrastructure and someone to build it. Designing something like this from scratch with someone who’s willing to invest in your ideas, Spaceway is your perfect partner.

Redmayne Engineering

We were delighted with the service from Spaceway.

Nick Aikenhead

MD, ALPMA UK

"I’m very pleased how they’ve gone through it all and actioned it and they’ve got good depth of resource, good depth of people, and good skilled people who work well and tightly and good communication. So I’m delighted."

Coopervision

The project was designed to meet our specific requirements which included fitting in 20 more additional workstations using the existing space. The design works well and has met our expectations fully, we will continue to use Spaceway, they do a good job.

A J Wells

Another project well done by Spaceway. As before, we're very pleased with everything from concept through to completion.

Lydiard Park Academy

Our project was finished on time and to budget in what was a very short timescale, which is a credit to the team at Spaceway!

Bodywise

Thank you to Spaceway for the improvements that have been made to move Bodywise forward. You've done a very good job and we look forward to working with you again.

Mark Rowe

Glenmore Consultants

The office fit out is superbly finished to the highest standards and beyond our expectations.

Richard De Crausaz

Cookson Electronics

Spaceway worked with us to create the perfect environment for our staff. The completed project was fantastic and utilised the space to provide  practical, modern and attractive working surroundings.

Paul Callus

Plastimo UK Limited

We are delighted with the finished product. The space has been turned into an exceptional working environment, which will serve us well for years to come

Stone Bridge United

We're very impressed with the Spaceway team and the whole project was installed without fault. We are looking forward to working with the team again.
Get In Touch