Spaceway launches workspace calculator and leasing scheme to cut capital outlay for businesses needing additional office and storage space
December 20, 2021
How Long Do New Year Resolutions Last?
December 20, 2021

We’re delighted to showcase one of our latest completed projects which has been featured in several trade journals and industry magazines including Architects Datafile and Premier Construction. Our client Norwegian Cruise Lines had a very particular brief for its Head Office refurbishment in Southampton.
Their office requirements comprised of a combination of executive suites, meeting rooms, conference rooms, kitchen and 600 open plan desks. The conference centre can accommodate up to 30 people and has a partitioning door to allow the space to be sectioned into two smaller areas.

Boat shaped tables take centre stage and the trophy cabinets are home to a selection of model cruise liners.
The transformation has brought together a number of brands which sit under its parent company Norwegian Cruise Lines, including; Prestige Cruises, American Cruise Lines and Regency Seven Seas. The 600 strong team is now housed together at Mountbatten House, Grosvenor Square, confirming Southampton’s position as the leading cruise port in Northern Europe.
The interior of the office has been designed with a nautical theme in mind, with subtle hints, ebbing and flowing throughout the building. Speaking about the project Dominic O’Brien, Director at Spaceway, said:

“Our client had a very clear vision on how its new office should look. We worked closely with the client and its chosen designer to ensure its vision became a reality. Once inside, you instantly get the feel of being onboard one of the luxury cruise liners. The level and attention to detail in the office is strikingly obvious, without being overwhelming.”

A feature glass partitioning system was installed and manufactured with stainless and frameless glass to ensure no joints were visible and complements the sleek look of the office. Dominic added:

“As you walk through the corridors past the glass and curved walls, you could be mistaken for thinking you are on one of the ships walk ways.
“The nature of having too much glass in a building can often create a sterile effect, to counteract this, we designed special transfers for the glass which adds to the uniqueness of the office.”

The installation was completed on a fast track programme. Once the designs were in place it was all hands on the deck. When Spaceway arrived on site, the building was one large empty box. Spaceway supplied and delivered all the materials to the site, ran the project with precision and worked day and night to ensure the project ran to the very tight schedule.

Comments are closed.

Use our Free Online Calculator to find
out how much a new Mezzanine Floor
might cost.

Testimonials

Lydiard Park Academy

Our project was finished on time and to budget in what was a very short timescale, which is a credit to the team at Spaceway!

Specsavers

The project was challenging to say the least with the removal of 280 workstations and fitting of 400 new ones, along with collaboration areas and 400 bespoke lockers over two weekends, but Spaceway managed to complete this along with office refurbishment works on time and to an excellent standard.

Redmayne Engineering

We were delighted with the service from Spaceway.

Nick Aikenhead

MD, ALPMA UK

"I’m very pleased how they’ve gone through it all and actioned it and they’ve got good depth of resource, good depth of people, and good skilled people who work well and tightly and good communication. So I’m delighted."

Richard De Crausaz

Cookson Electronics

Spaceway worked with us to create the perfect environment for our staff. The completed project was fantastic and utilised the space to provide  practical, modern and attractive working surroundings.

Coopervision

The project was designed to meet our specific requirements which included fitting in 20 more additional workstations using the existing space. The design works well and has met our expectations fully, we will continue to use Spaceway, they do a good job.

Greg Bedford

Eurotubes

It’s no good having just an empty industrial building you need a concept for space, a design, an infrastructure and someone to build it. Designing something like this from scratch with someone who’s willing to invest in your ideas, Spaceway is your perfect partner.

Alan Fisher

Car Link

“I was so happy I did not get bothered throughout the extensive works and that a strict timetable was completed flawlessly. Fantastic experience all round.”

A J Wells

Another project well done by Spaceway. As before, we're very pleased with everything from concept through to completion.

Stone Bridge United

We're very impressed with the Spaceway team and the whole project was installed without fault. We are looking forward to working with the team again.

Mark Rowe

Glenmore Consultants

The office fit out is superbly finished to the highest standards and beyond our expectations.

Bodywise

Thank you to Spaceway for the improvements that have been made to move Bodywise forward. You've done a very good job and we look forward to working with you again.

Paul Callus

Plastimo UK Limited

We are delighted with the finished product. The space has been turned into an exceptional working environment, which will serve us well for years to come
Get In Touch