The Challenge
The project required the design and installation of a two-tier, heavy-duty mezzanine floor, capable of supporting not only the automation system but also the associated materials handling machinery.
Key challenges included:
- Load capacity: The mezzanine needed to be engineered to withstand the significant weight and dynamic forces of automation equipment.
- Scale: At 5,100 ft², the mezzanine was a substantial addition to the facility.
- Business continuity: Draper needed to continue operations during the installation, meaning careful planning and phasing were essential.