• Services
    • Mezzanine Floors
    • Office Interiors
    • Production & Manufacturing
    • Light Industrial
    • Workspace Consultancy
  • Sectors
    • Office
    • Production
    • Industrial
    • Retail
    • Education
  • Projects
  • News
  • About Us
  • Start your project
  • Mezzanine Calculator
  • View Our Brochure
  • Contact
  • Services
    • Mezzanine Floors
    • Office Interiors
    • Production & Manufacturing
    • Light Industrial
    • Workspace Consultancy
  • Sectors
    • Office
    • Production
    • Industrial
    • Retail
    • Education
  • Projects
  • News
  • About Us
  • Start your project
  • Mezzanine Calculator
  • View Our Brochure
  • Contact
Home | News | Breaking News – Futuristic Production Facility for Cosmetic Giant

Breaking News – Futuristic Production Facility for Cosmetic Giant

Start your project

You can get in touch with us by filling out the form on this page or by using the details shown below.

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.

Category: News

Dec 20, 2021

One of the world’s largest and best-known cosmetics producer recently awarded Spaceway the contract to fit out a new futuristic production line.

Spaceway famous for their innovative mezzanine floor solutions offered to fit the new production facility in the only free space available, 4m above the current floor level on a new mezzanine floor. Space at the cosmetics factory was at such a premium that Spaceway’s idea was embraced and developed with their team of designers for many months before finally getting the go ahead from the companies New York HQ.

The project featured cleanroom standard ventilation and air filtration, LED lighting, frameless glass partitioning, and a very heavy duty mezzanine floor capable of supporting vessels of 1000kgs in weight.

The clients were so pleased with the new mezzanine floor solution that they invited Spaceway to extend their contract to an existing mezzanine floor that desperately required updating to a more modern finish.

The project completed in February 2017 and took 20 weeks to complete, on time and to budget.

Prev post

Spaceway Contractor Completes Brutal Event For Charity

Next post

Kier Name Spaceway As Site Safety Winners

Services

  • Mezzanine Floors
  • Office Interiors
  • Production & Manufacturing
  • Light Industrial
  • Workspace Consultancy

Sectors

  • Office
  • Production
  • Industrial
  • Retail
  • Education

Spaceway

  • Projects
  • News
  • About Us
  • Contact

Legal

  • Privacy Policy
  • Terms & Conditions
  • Terms of Business
  • Quality Policy
  • 0800 085 1022
  • info@spaceway.co.uk
  • Fernacre House,
    U11 Fernacre Industrial Estate,
    Budds Lane,
    Romsey,
    Hampshire,
    SO51 0HA
  • Privacy Policy
  • Terms & Conditions
  • Terms of Business
  • Quality Policy

Your space, your way.

Made by blue bee. © Spaceway 2026

Let's get started

You can get in touch with us by filling out the form on this page or by using the details shown below.

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.