Use our Free Online Calculator to find
out how much a new Mezzanine Floor
might cost.

Spaceway are delighted to announce a successful renewal of the ISO 9001 Quality Management Systems.
After a rigorous few days of inspections, testing and validation the Spaceway Team came through with flying colours.
All tested categories came back with either excellent 90% or very good 10% when validated.
Clive Verney Spaceway Contracts manager commented:
“it was hard work but with the help of the team we more than exceeded our expectations which were very high to start with..We have now continuously obtained ISO standards since 1999, so 24 years in a row – that says a lot about the consistency of our quality and efficiency.”
“This type of qualification directly impacts on how we deliver our projects on time and to budget so often, ultimately keeping our clients very happy!”
See the Certificate of Approval by clicking here.
We were delighted with the service from Spaceway.
MD, ALPMA UK
"I’m very pleased how they’ve gone through it all and actioned it and they’ve got good depth of resource, good depth of people, and good skilled people who work well and tightly and good communication. So I’m delighted."
We're very impressed with the Spaceway team and the whole project was installed without fault. We are looking forward to working with the team again.
Another project well done by Spaceway. As before, we're very pleased with everything from concept through to completion.
Cookson Electronics
Spaceway worked with us to create the perfect environment for our staff. The completed project was fantastic and utilised the space to provide practical, modern and attractive working surroundings.
Thank you to Spaceway for the improvements that have been made to move Bodywise forward. You've done a very good job and we look forward to working with you again.
The project was challenging to say the least with the removal of 280 workstations and fitting of 400 new ones, along with collaboration areas and 400 bespoke lockers over two weekends, but Spaceway managed to complete this along with office refurbishment works on time and to an excellent standard.
Glenmore Consultants
The office fit out is superbly finished to the highest standards and beyond our expectations.
The project was designed to meet our specific requirements which included fitting in 20 more additional workstations using the existing space. The design works well and has met our expectations fully, we will continue to use Spaceway, they do a good job.
Car Link
“I was so happy I did not get bothered throughout the extensive works and that a strict timetable was completed flawlessly. Fantastic experience all round.”
Plastimo UK Limited
We are delighted with the finished product. The space has been turned into an exceptional working environment, which will serve us well for years to come
Eurotubes
It’s no good having just an empty industrial building you need a concept for space, a design, an infrastructure and someone to build it. Designing something like this from scratch with someone who’s willing to invest in your ideas, Spaceway is your perfect partner.
Our project was finished on time and to budget in what was a very short timescale, which is a credit to the team at Spaceway!