LOCATION: BORDON, HAMPSHIRE
SIZE: 25,000 FT2
COST: £180,000
TYPE: WAREHOUSE FIT OUT

Coomers

Products used

HI-BAY PALLET RACKING      CANTILEVER RACKING    SHELVING

About the project

At their Oakhanger site business was becoming busier, this resulted in them requiring to establish a close working relationship with a storage equipment supplier who could come in, discuss and understand there requirements and implement whilst not affecting there daily business.

Spaceway were awarded the contract due to our attention to detail and being able to install the project without affecting there day to day business.

Spaceway started works outside by installing various sizes of external cantilever racking to accommodate all the differing sizes of stock, we also installed heavy duty galvanised pallet racking.  Once this has been completed Spaceway then fitted out the warehouse with pallet racking and specialist mesh containers to store large rolls of insulation.

The whole project was completed without interruption to Coomers who had to maintain busy daily trading schedules

Project overview

Use our Free Online Calculator to find
out how much a new Mezzanine Floor
might cost.

Testimonials

Paul Callus

Plastimo UK Limited

We are delighted with the finished product. The space has been turned into an exceptional working environment, which will serve us well for years to come

Stone Bridge United

We're very impressed with the Spaceway team and the whole project was installed without fault. We are looking forward to working with the team again.

A J Wells

Another project well done by Spaceway. As before, we're very pleased with everything from concept through to completion.

Specsavers

The project was challenging to say the least with the removal of 280 workstations and fitting of 400 new ones, along with collaboration areas and 400 bespoke lockers over two weekends, but Spaceway managed to complete this along with office refurbishment works on time and to an excellent standard.

Coopervision

The project was designed to meet our specific requirements which included fitting in 20 more additional workstations using the existing space. The design works well and has met our expectations fully, we will continue to use Spaceway, they do a good job.

Alan Fisher

Car Link

“I was so happy I did not get bothered throughout the extensive works and that a strict timetable was completed flawlessly. Fantastic experience all round.”

Redmayne Engineering

We were delighted with the service from Spaceway.

Lydiard Park Academy

Our project was finished on time and to budget in what was a very short timescale, which is a credit to the team at Spaceway!

Bodywise

Thank you to Spaceway for the improvements that have been made to move Bodywise forward. You've done a very good job and we look forward to working with you again.

Mark Rowe

Glenmore Consultants

The office fit out is superbly finished to the highest standards and beyond our expectations.

Greg Bedford

Eurotubes

It’s no good having just an empty industrial building you need a concept for space, a design, an infrastructure and someone to build it. Designing something like this from scratch with someone who’s willing to invest in your ideas, Spaceway is your perfect partner.

Nick Aikenhead

MD, ALPMA UK

"I’m very pleased how they’ve gone through it all and actioned it and they’ve got good depth of resource, good depth of people, and good skilled people who work well and tightly and good communication. So I’m delighted."

Richard De Crausaz

Cookson Electronics

Spaceway worked with us to create the perfect environment for our staff. The completed project was fantastic and utilised the space to provide  practical, modern and attractive working surroundings.