Vikoma
December 17, 2021
Antalis
December 17, 2021

Alitex

CLIENT: ALITEX
LOCATION: PETERSFIELD, HAMPSHIRE
SIZE: 2,500 FT2
COST: £170,000
TYPE: MEZZANINE FLOORS

Alitex

Products used

SUSPENDED CEILINGS      PARTITIONS

About this project

When glasshouse and greenhouse creators, Alitex, chose the Spaceway Group to fit out its headquarters in Petersfield in 2001, it asked Spaceway to install a 26m2 mezzanine floor in preparation for further expansion.  With a 50% increase in personnel and a bulging order book for its glass structures, Alitex needed to carry out phase two of the original office fit out by reconfiguring the ground floor accommodation and fitting out the mezzanine.

Our approach

When we began the designs for the mezzanine it realised that during the summer months, heat would build-up in the area creating uncomfortable working conditions.

To overcome this problem, Spaceway suggested the installation of Ecophon Advantage 40mm thick insulated tiles laid in a grid along the profile of the roofline.  With the insulation work completed, Spaceway’s team began fitting out the mezzanine.   A purpose built ambulant timber staircase with powder coated Spaceway handrail system was installed from the ground floor to the mezzanine.  Komfort Kameo 75mm fire rated partitioning was installed to create the 107m2 canteen, 60m2 training room and a 39m2 boardroom.  To enable the canteen and training room to be opened into one large area, Spaceway installed a top hung acoustic dividing wall system with veneer finish.  Finally, as Alitex wanted to be able to write on one of the training room walls instead of having a board, Spaceway covered one wall with white Muraspec Memorase vinyl, which can be quickly wiped clean.

With space freed up on the ground floor from the relocation of the canteen and boardroom, Spaceway completed the work by reconfiguring these areas into new office accommodation.

 

Solutions / products used

A 26m2 mezzanine floor in preparation for further expansion.
Reconfiguring the ground floor accommodation and fitting out the mezzanine.
The installation of Ecophon Advantage 40m thick insulated tiles laid in a grid along the profile of the roofline.
A purpose built ambulant timber staircase with powder coated Spaceway handrail system installed from the ground floor to the mezzanine.
Komfort Kameo 75mm fire rated partitioning was installed to create the 107m2 canteen, 60m2 training room and a 39m2 boardroom.
A top hung acoustic dividing wall system with veneer finish to enable the canteen and training room to be opened into one large area.
One wall covered with white Muraspec Memorase vinyl as a blackboard in the training room, which can be wiped clean.

Use our Free Online Calculator to find
out how much a new Mezzanine Floor
might cost.

Testimonials

Stone Bridge United

We're very impressed with the Spaceway team and the whole project was installed without fault. We are looking forward to working with the team again.

Coopervision

The project was designed to meet our specific requirements which included fitting in 20 more additional workstations using the existing space. The design works well and has met our expectations fully, we will continue to use Spaceway, they do a good job.

Lydiard Park Academy

Our project was finished on time and to budget in what was a very short timescale, which is a credit to the team at Spaceway!

Greg Bedford

Eurotubes

It’s no good having just an empty industrial building you need a concept for space, a design, an infrastructure and someone to build it. Designing something like this from scratch with someone who’s willing to invest in your ideas, Spaceway is your perfect partner.

Paul Callus

Plastimo UK Limited

We are delighted with the finished product. The space has been turned into an exceptional working environment, which will serve us well for years to come

Mark Rowe

Glenmore Consultants

The office fit out is superbly finished to the highest standards and beyond our expectations.

Nick Aikenhead

MD, ALPMA UK

"I’m very pleased how they’ve gone through it all and actioned it and they’ve got good depth of resource, good depth of people, and good skilled people who work well and tightly and good communication. So I’m delighted."

Bodywise

Thank you to Spaceway for the improvements that have been made to move Bodywise forward. You've done a very good job and we look forward to working with you again.

Specsavers

The project was challenging to say the least with the removal of 280 workstations and fitting of 400 new ones, along with collaboration areas and 400 bespoke lockers over two weekends, but Spaceway managed to complete this along with office refurbishment works on time and to an excellent standard.

A J Wells

Another project well done by Spaceway. As before, we're very pleased with everything from concept through to completion.

Alan Fisher

Car Link

“I was so happy I did not get bothered throughout the extensive works and that a strict timetable was completed flawlessly. Fantastic experience all round.”

Redmayne Engineering

We were delighted with the service from Spaceway.

Richard De Crausaz

Cookson Electronics

Spaceway worked with us to create the perfect environment for our staff. The completed project was fantastic and utilised the space to provide  practical, modern and attractive working surroundings.
Get In Touch